FOSHAN / Lighting sourcing
Choose the light.
Clarify the system.
Turn a lighting mood into a fixture schedule your supplier and local installer can review. Prepare dimensions, controls, samples and a coordinated delivery record before ordering from Foshan.
START WITH THE RIGHT RECORDS
Fixture schedule
Record the requirement, not just the reference image.
Controls & compatibility
Make the interfaces and responsibilities explicit.
Samples & handoff
Keep the approved record with the delivery documents.
THE FIELD GUIDES
From an idea to
a useful sourcing brief.
Build a room-by-room fixture schedule
Give every light a purpose, location and stable reference before comparing styles. Record the physical interface separately from the visible fixture size.
02 / LightingConfirm the fixture, driver and control as one combination
The word dimmable is a starting point, not a compatibility record. Identify the exact equipment and the behaviour the project expects before confirming a controlled-lighting order.
03 / LightingKeep lighting sample approval specific and traceable
Separate appearance selection, functional observations and document review. A successful showroom demonstration does not by itself confirm the full order or the conditions at the destination.
04 / LightingHand over labelled lighting parts and the right documents
Prepare delivery so the receiving team can identify complete fixtures, separate damaged items and find the documents for each model. Keep arrival, installation and commissioning as different stages.
YOUR PROJECT, ONE CONTACT
Bring your next question
to FoshanBuild.
Share what you have. We can start by clarifying the scope and the missing information.